ACPin
05-04-2003, 07:24 PM
You can find them at my homepage. (http://www.acpinlac.com/Home.html)
The hangar bay control room has been updated with the standard blast doors and the straight hallway was redesigned with blast doors on both ends. The two are also shown connected to the elevator shaft and side by side.
The hangar bay control room has been updated with the standard blast doors and the straight hallway was redesigned with blast doors on both ends. The two are also shown connected to the elevator shaft and side by side.